
You've written the business plan, secured the land, and chosen your structures. Your project is officially a business.
The next step—permitting—is where the rules change completely. Building a backyard shed for personal use is one process; building a hospitality business that hosts the public is another. The regulatory concern shifts from "protecting one family" to "protecting the general public."
I'm Praveen, and I've guided commercial glamping projects across the world. The biggest mistake entrepreneurs make is treating their first glamping unit like a residential home, only to be stopped by the local council or fire authority.
This guide will demystify the commercial permitting process in Australia by defining the four critical areas where the National Construction Code (NCC) and state planning schemes impose strict and non-negotiable requirements. Understanding these rules is the difference between a project that launches successfully and one that is dead on arrival.
The Code Shift — When "Residential" Becomes "Commercial"
The permitting process changes because your use of the structure changes. As a commercial hospitality business (a "short-term rental"), you are governed by the National Construction Code (NCC) and its state/territory adaptations.
The NCC classifies a transient short-term rental or glamping resort as either a Class 1b (Boarding Houses, etc., with small numbers of people) or a Class 3 (Hotels, Motels, etc.) Occupancy, depending on the scale. This classification is the trigger for all the strict commercial codes that follow.
The Four Areas Where Commercial Rules Apply
1. Life Safety & Egress (The Exit Rules)
The number one priority of the NCC and Fire Authority is life safety for the public.
- The Commercial Requirement (BCA/NCC): Class 1b/3 Occupancy triggers stringent requirements for the number and size of exits (BCA Section D). You must prove that every guest can exit the structure quickly and safely in the event of an emergency. This often means:
- Exit Widths: Doors and pathways must meet minimum egress widths.
- Emergency Lighting: Requirement for illuminated exit signs and dedicated emergency lighting on pathways.
- Fire Safety Measures: Requirements for commercial-grade fire extinguishers and smoke alarms in each unit.
- The Operator's Task: Work with your local Building Surveyor and Fire Authority early. Our larger yurts are designed to accommodate the necessary door widths and clear exit paths, simplifying this compliance step.
2. Infrastructure & Health (The Utility Rules)
Commercial use generates significantly more stress on water, waste, and fire systems, governed by the Health Department and Fire Code.
- The Commercial Requirement: Your septic and sewer systems must be designed for a commercial occupancy load (AS/NZS standards). A system designed for a small family will fail if it's used by multiple guests every week. This includes:
- Commercial-Grade Septic: Required to handle high, rapid waste volume, often necessitating a larger or more complex treatment system.
- Fire Safety Water Supply: Depending on your site's location and Fire Authority rules, you may need a dedicated water tank (often 10,000L+) or static water supply for fire fighting purposes.
- The Operator's Task: Budget for a commercial-grade septic design approved by the local Health Unit. This is more expensive but non-negotiable for approval.
3. Accessibility (The Disability Discrimination Act & NCC Part D3)
As soon as you open your doors to the public, you become subject to the Disability Discrimination Act (DDA) and accessibility requirements in the NCC.
- The Commercial Requirement: You are required to provide a minimum number of units that are fully accessible (depending on the total size of your site). This means:
- Accessible Paths: Ramps must replace stairs to the platform.
- Unit Layout: Wider doorways, accessible washrooms with grab rails, and clear maneuvering space (NCC Part D3).
- The Operator's Task: Do not wait until after construction. Plan for accessibility compliance before you pour the foundation. Our circular yurts are inherently flexible for ramp installation, but the interior must be designed specifically for accessibility.
4. Zoning & Land Use (The Development Application Rules)
This is often the biggest hurdle. You need formal Development Approval (DA) from your local council.
- Residential Standard: Your land is zoned for a single-family dwelling (Class 1a).
- Commercial Standard (Planning Department): You need explicit council approval for "Short-Term Rental," "Tourist Accommodation," or "Caravan Park/Campground" use. This often triggers requirements for:
- Bushfire Attack Level (BAL) Assessment: A critical requirement in most regions. The materials and construction must meet the specific BAL rating of your site.
- Parking Minimums: You must provide a specific number of designated parking spots per unit (local council requirement).
- Environmental Review: Formal studies may be required to assess the impact on the local environment and community.
- The Operator's Task: Approach your local council's Planning Department first. Getting Development Approval is the first and most critical legal step.
Conclusion: Commercial Permits Are an Investment, Not a Burden
Commercial permitting is more complex, but it's the process that legitimizes your business. It's the investment that protects your customers, your brand, and your long-term bottom line.
The key to success is pairing your unique glamping vision with professional engineering that addresses every one of these commercial codes.
At The Out Factory, we provide more than a structure. We provide the professional engineering packages (with structural data benchmarked to international standards), fire retardancy certifications (AS/NZS 1530.2/3), and expert consultation needed to have a confident conversation with every single council department. You are not alone in navigating this.

uniquely yours?
Explore Limitless options in our 3d yurt builder
and bring your vision to life

.png)




















.png)