
You've designed your yurt, you've chosen your site, and you're ready to build. Then you hear the word that can stop any dream in its tracks: "permits."
It's a word that can feel intimidating, loaded with images of paperwork, confusing regulations, and bureaucracy. I've guided hundreds of clients through this process all over the world, and I want to assure you of one thing: permitting isn't a wall designed to stop you; it's a process designed to keep you safe.
This guide is your roadmap. We'll demystify the process by breaking it down into three logical parts: understanding the codes, providing the right engineering data, and creating a practical plan to work with your local council. With the right information and the right partner, this is an entirely manageable process.
Part 1: The Language of the Law — Understanding Australian Building Codes
Before you ever speak to an official, it's helpful to understand the "language" of building regulations. The goal of every building code is simple: safety. It ensures any structure is built to withstand local conditions and is safe for people to live in. In Australia, the foundational document is the National Construction Code (NCC), which includes the Building Code of Australia (BCA).
Where Does a Yurt Fit In?
A modern, four-season yurt is a unique structure. The NCC would generally classify it under the category of a "Membrane-Covered Frame Structure." This is the correct terminology to use when speaking with your local council's building surveyor. It's not a simple tent, but it's also not a conventional house. This is why the first step in the permitting process is for your council to determine how to classify your yurt's use, usually as one of three things:
- Temporary Structure: For short-term use, often with fewer requirements.
- Secondary Dwelling (or "Granny Flat"): A secondary home on a property with an existing house. This is an increasingly popular and often streamlined path for getting a yurt approved.
- Permanent Dwelling (Class 1a Building): A primary residence, which will require the most thorough review to ensure it meets all residential codes.
The Code is Your Ally: A Key Section to Know
For any innovative structure like a yurt, the most powerful part of the NCC is its provision for "Performance Solutions" (also known as alternative solutions). This is your secret weapon, as it gives your building surveyor the explicit authority to approve non-traditional designs.
In plain English, it states that the code is not meant to prevent new or alternative methods of construction. The official has the power to approve your yurt as long as you can provide evidence that the design meets the relevant Performance Requirements of the code.
This is why providing our detailed engineering data (from Part 2) is so critical. Our specs are the professional proof you need to satisfy the Performance Requirements and demonstrate that your yurt is a safe, strong, and durable structure.
Part 2: The Engineer's Answer — Providing the Right Technical Data
Your local building surveyor isn't your adversary; they are a safety professional who needs data to do their job. Your goal is to provide them with the professional engineering specifications to prove your yurt is a safe, durable structure. A world-class manufacturer should make this easy for you.
Here are the questions your surveyor will ask, and the specific, data-backed answers for an Out Factory yurt.
1. "How does it handle high winds?" (Wind Load)
- Our Rating: 173 mph (278 kph)
- Our Process: Our yurts are engineered to a global standard. The 173 mph rating is the result of a comprehensive structural analysis conducted by our engineering team, with calculations benchmarked against international engineering principles like ASCE 7-10. This data is then compiled into a professional engineering package that we provide to our clients, ready for submission to a registered Australian structural engineer for review and certification (e.g., a Form 15 in Queensland) as required by your local council.
2. "How does it handle snow?" (Snow Load)
- Our Rating: 2.87 kPa (which is equivalent to 60 psf).
- Our Process: While only relevant for specific alpine regions in Australia, our 2.87 kPa rating comes from the same rigorous engineering process. Our team's structural analysis accounts for the strength of our robust Canadian wood frame and efficient roof pitch. This data is provided in our engineering package, ready for local review.
3. "What about bushfire safety?" (BAL Rating & Fire Retardancy)
- Our Rating: Our outer fabric from Serge Ferrari is a high-performance material with extensive third-party testing.
- The Certifications: It meets numerous international standards, including AS/NZS 1530.2 and 1530.3. This demonstrates its performance in terms of flammability and spread of flame, a critical factor for any Bushfire Attack Level (BAL) assessment your council may require.
4. "How does it perform in an earthquake?" (Seismic Performance)
- The Answer: A yurt is a lightweight, flexible structure. Unlike a rigid, heavy building, its tensile design can move and absorb seismic forces very effectively. As our architect explains, the primary concern isn't the yurt itself, but the foundation it's built on. A properly engineered platform is the key to seismic safety, and the yurt's light weight places significantly less stress on it.
5. "Is it energy efficient?" (Insulation)
- Our Rating: Our standard insulation has an R-Value of 25.34 (ft²·°F·hr/BTU).
- The Certification: This value is tested according to the ASTM C518 standard. Our Alufoil XLPE insulation is a closed-cell material, meaning it does not absorb water and provides consistent, high-performance thermal resistance to meet Australia's energy efficiency requirements.
Part 3: The Practical Path — Your Local Council Action Plan
With your engineering data and knowledge of the codes, it's time to talk to your local council. The best advice I can give is to treat your council's planning officers and building surveyors as your most valuable local resource. Their job is not to say "no"; their job is to help you build a safe home.
Here is a step-by-step action plan for that process:
1. The First Call: Ask the Right Questions
Call your local council's planning or building department and be prepared. Here's what to ask:
- What are the specific local requirements for wind rating and BAL rating at my property's location?
- Has the council previously approved "membrane-covered frame structures" or yurts as a Class 1a or Class 10a building?
- What are the requirements for installing a septic system or connecting to services?
2. Gather Your Documents
You will typically need a professional package for your Development Application (DA) or Complying Development Certificate (CDC) application, including:
- A Site Plan showing your property and the proposed yurt location.
- The Yurt Specifications (the data from Part 2 of this article, which we provide).
- A Foundation Plan detailing how your platform will be built.
3. Submit Your Application
Package everything professionally and submit your application. Be prepared for questions and requests for more information.
This final step is where having an experienced partner is invaluable. While we can't file the permit for you, our team has experience with projects all over the world. We provide you with the professional engineering documents, technical data, and expert advice you need to have a confident conversation with your local authority. You are not alone in this.
Conclusion: From Process to Peace of Mind
Permitting isn't a wall; it's a series of gates. By understanding the codes, providing clear engineering data, and working collaboratively with your local council, you can open each one. The goal is to build your dream yurt legally and safely, giving you the ultimate peace of mind to enjoy your new round home for years to come.
FAQs
1. What happens if I build without a permit?
Building without a permit can result in a "stop work" order, significant fines from the council, and potentially an order to demolish the structure. It will also make it impossible to get insurance. We strongly advise against it.
2. Does The Out Factory provide the engineered drawings I need?
Yes. We provide our clients with a full set of technical specifications and drawings for our yurts that you can submit to your local council as part of your application package.
3. Is it easier to get a permit for a yurt as a granny flat?
It can be. Many states and councils have streamlined pathways for approving secondary dwellings or "granny flats," such as a Complying Development Certificate (CDC) in NSW. This can be a more straightforward process than a full DA for a new primary residence. Always check your local planning rules.


uniquely yours?
Explore Limitless options in our 3d yurt builder
and bring your vision to life

.png)





















.png)